| Title | Closing Date | Pre-Proposal | |
|---|---|---|---|
| Signage Repair |
n/a |
||
| Asbestos Testing, Assessment, and Abatement Services |
|
||
| Medical Gas Equipment Services |
03-04-2026 @ 1:30 p.m. Please meet at the contractor check-in on the north side of the building (roughly 201 Feliks Gwordz place on your GPS). |
||
| Flooring Repairs and Installation |
03/11/2026 @ 1:30pm, Please meet at the construction/vendor check-in on the North side of the main campus |
||
| Graduate Medical Education (GME) Strategy Consultant |
n/a |
||
| Automatic/Manual Transfer Switches and Paralleling Switchgear Annual Preventative Maintenance and Repairs |
n/a |
||
| Boiler Repair and Maintenance |
n/a |
||
| Sushi and Hot Asian Food Provider |
n/a |